A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
Created by Gary // 0 threads
Why would you put a gate across an official cycle route through the "Hangings" in Harwich, on the North Sea Cycle Route from Harwich International to Harwich Town? I've seen visitors from Europe try and cycle through this obstruction with trailers.
Created by Anna Langley // 0 threads
In advance of whatever fair it is appearing on Midsummer common, the "cyclists dismount" signs have appeared on the entrances to the common.
Created by David Earl // 1 thread
Leaflet through my door today about "new homes on land off Teversham Road, Fulbourn". Unspecific at this stage, will be revealed, no doubt, at consultation event on 28 June. But it must be big for the scale of the consultation. It also has a website: http://www.castlefieldconsultation.co.uk but that also says nothing very specific as yet.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.